This job involved unloading possies and timbers from the truck and then placing the materials on site so that the builders could erect them.
Today was the possies. These are floor trusses placed on the ground floor wall frames to support the second floor.
Then will come the upper wall frames which get placed on the second floor once laid.
Once the second floor walls are erected they are braced and the trusses will arrive to be placed on top of them.
This whole process speeds up the build time as the chippies dont have to lift every piece one at a time.
The builders were happy with our work and thanked us for a hassle free process.