I was hired in to dual lift bridge abutment beams into position. After finding the balance point of the load we then maneuvered the crane and excavator into position to slowly lower it onto steel pylons that had already been installed.
Then for a 20 minute trip for me to get back over the other side to repeat the process.
This was completed with the assistance of an Electrical Spotter and an Intermediate Rigger which made the job flow successfully and safely.
The client was happy to have this done as he had ordered a Concrete truck in to pour concrete which would lock the works into position.