New Units Under Construction.

March 2019
Lifting a 3t Forklift onto the second level of this new unit block under construction in Bentleigh.

Posted by Admin in General | 1 Comment

Was contacted to unload and lift wall panels as well as a forklift and various other formwork items up onto the nsecond level of a new set of units under construction.

0 Comment

Leave Us Some Feedback

All fields marked with an * are required.